Power Supply Solution for Machine Room Simplification
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Introduction to Optical Reserve Scheme
Adopting a solution with optical storage integration,Through photovoltaic power generation (photovoltaic)、energy storage battery、triplicate protection
of municipal power coordination,realize“ Send electricity storage electricity equipment backup”
Based on the actual sunlight duration in the scenario,actual load power,actual electricity price,investment objective,install photovoltaic modules、
MPPT module、DC/DC module、Power of AC/DC module、and battery capacity。
optical storage system working logic
Under conditions of sufficient photovoltaic power,pointed、peak、Ping、arbitrary interval of valleys,The photovoltaic DC/DC
module is used to supply the base station DC load with photovoltaic power first;the part of photovoltaic power is supplemented by
energy storage battery or mains power according to different electricity price periods;
Energy storage batteries primarily serve base stations by balancing peak and off-peak loads through their charge-discharge
capabilities,Energy saving and cost reduction,The workflow logic is as follows。
Sharp peak period,The photovoltaic and energy storage system are superimposed to supply power to the load。
During the period of flat electricity,The photovoltaic power and mains power are superimposed to supply power to the load。
off-peak electricity period,load power supply Meanwhile, the mains power charges the energy storage battery.
Under conditions of rainy weather and power outages,Energy storage batteries can also serve as emergency backup power
for base station batteries during power outages,It can meet the daily energy storage discharge and leave some spare battery
capacity。
Characteristics of the monitoring backend:
You can monitor the working status and real-time data
of each site in real time: when an exception occurs Alarm.
can be remotely controlled;
Cloud server Security and stability:
multi-level permission accounts ;
Area to point management.
Step 3: Outgoing Quality Control
After all parts finish, we will conduct final quality control, and this will be done by the inspection experts in the QC room. At Shanghai Elue,our QC members will utilize height gages, microscopes, 2D projectors, micrometers, and CMM to ensure that the products meet shipping specifications and customer requirements. It includes: visual inspection (color, roughness, burrs, scratches) , dimensions, performance testing if any (physical, electrical, mechanical, operational control).And we will release final inspection report before shipping.
INSPECTION GAGES
Tesa 3D CMM
Optical comparators
Mitutoyo Profilometers
Profile/Contour detector
Projectors
Rockwell Hardness Tester
0.00005″ Indicating micrometers
Class X, XX, and XXX ring, hole and plug gauges
Full complement of standard gauges and inspection tools, including micrometers, calipers, and indicatorsCustomers' Feedback






